Volkswagen gives ID.3 to 150 employees for testing

All Volkswagen ID.3 related discussions
Post Reply
User avatar
Rob
Site Admin
Posts: 100
Joined: Mon Mar 31, 2014 2:38 pm

Post by Rob »

They will be testing the all-electric Volkswagen ID.3 for everyday usability over a period of several weeks – before delivery officially starts in early September. A total of 150 ID.3 built in Zwickau have been reserved for employees at the three plants in Saxony for everyday testing under real conditions to analyze anonymized data on the usage and driving behavior of the ID.3. Over the coming months, this will provide Volkswagen with a steady stream of additional information from hundreds of thousands of kilometers travelled.

DB2020AL00751_medium.jpg

“The comprehensive driving profiles in the run-up to the European market launch of the ID.3 are extremely valuable to us and open up further potential for optimization”, Thomas Ulbrich, Volkswagen Brand Board Member for E-mobility, said. “Added to this is the very personal feedback from our employees. That means our team in Zwickau is not only building the ID.3 to the highest quality standards, it is also actively assisting in the further development of the technology and electric cars.”

Volkswagen is setting benchmarks with the ID.3: It is the world’s first car to be produced and delivered with a neutral CO2 balance. The new electric car offers dynamic driving characteristics, long ranges and plenty of interior space. With the ID.3, Volkswagen is making e-mobility affordable for millions of people: In terms of total cost of ownership and depending on the model variant, acquisition and operating expenses for the ID.3 are on the same level as a comparable internal combustion engine model.

Voluntary testers selected by lucky draw

The ID.3 fleet from Saxony consists of 150 vehicles that will be made available to Volkswagen employees at the Zwickau, Chemnitz and Dresden plants in several waves over the coming weeks. A lucky draw was held to select the voluntary testers. The test vehicles are not yet equipped with the designated final software status and will be receiving regular updates during the test phase.

Abadgermac
Posts: 195
Joined: Fri Feb 21, 2020 1:35 pm

Post by Abadgermac »

Anyone else get the feeling that this should have happened months ago?
ID.3 1st Edition, Manganese Grey Metallic. 2.1 Software update 7 April 2021. 2.3 OTA Software update 2 August 2021. Dealer installed 2.4 update & battery 29 July 2022. 3.0 OTA update 21 December 2022. 3.2 Dealer installed October 2023.
Post Reply